PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing duct hangers at the Main Lobby Facing North-East (800x600).jpg Installing pour stops at Stair -4 Facing North-East  (800x600).jpg Pouring the concrete slab on grade Facing South (800x600).jpg Pouring the concrete slab on grade Facing South-West (800x600).jpg Duct hangers at the Main Lobby Facing West (800x600).jpg Griding and repairing the Main Steel at the Monumental Stairs Facing South (800x600).jpg
Previous pageNext page Installing pour stops at Stair -4 Facing North-East  (800x600)
Installing pour stops at Stair -4 Facing North-East (800x600)